LCD "Molodezhny" (Krasnogorsk). New building: youth residential complex in the city of Podolsk

The residential complex Molodyozhny is being built in the town of Zelenograd near Moscow. According to the design declarations, the complex will include 16 monolithic economy-class buildings.

The developer of the project was Stroypromavtomatika. The full completion of construction is scheduled for 2022, some of the buildings have already been commissioned.

Apartments

Buyers of apartments in the Molodyozhny Residential Complex are offered studio apartments, one-, two- and three-room apartments of various planning solutions, ranging from 24 to 92.2 sq.m. Prices for offers in residential complexes start from 43,000 rubles. per sq. m.

How to buy

According to information from the developer, buyers of apartments in the Molodyozhny Residential Complex have access to mortgages from a number of partner banks of the project: Sberbank, Sovcombank, AbsolutBank, Gazprombank, and Deltacredit Bank.

Infrastructure

In the immediate vicinity of the residential complex Molodyozhny there is a kindergarten, a school, an equestrian center. The structure of the built-in infrastructure, which will include: playgrounds, parking, landscaped house territory.

How to get there

By private car, Molodyozhny residential complex can be reached along the Ilyinsky and Novorizhskoye highways. In addition, you can get here by public transport from the railway station Golitsyno.

Contract type

Additional information can be obtained from the developer by calling the contact number.

The Molodezhny quarter is being built in Krasnogorsk on the territory of 19 hectares. It includes 6 objects - 4 residential complexes and 2 class B and B+ business centers. To date, the residential complex "Molodezhny 1", the residential complex "Molodezhny 2", the residential complex "Molodezhny 3" and the retail and office center "Krasnogorsk-Plaza" have been put into operation.

Quarter Description

The construction of residential buildings is carried out according to monolithic technology. Starting from the second floor, apartments with free planning and high ceilings of 3 m were designed. Part of the premises is put into operation with finishing. On the upper floors there are several apartments with spacious terraces.

The first floors are designed non-residential. It will house shops, pharmacies, bank branches and other social institutions. The halls will be decorated with designer finishes and space for concierges will be provided.

Infrastructure

The complex provides for the construction of schools, kindergartens and business centers with an extensive shopping and entertainment area. An underground parking for 1,150 cars will be built as part of the Molodyozhny 3 and Molodyozhny 4 complexes for parking cars. Separately equip guest parking for 350 cars. More than 10% of the territory is allocated for children's playgrounds, sports and recreation areas. The adjacent territory will be fenced and guarded.

The microdistrict is located in one of the ecologically favorable zones of the Moscow region. The Banka River and the Moskva River flow nearby, and Europe's largest ski center "Snezhkom" is located. Within walking distance there are a large number of schools, medical institutions, supermarkets "Pyaterochka", "Dixie", "Olivier", etc., a cafe, an exhibition center and much more.

To the Moscow Ring Road - 3.5 km along the Volokolamsk or Novorizhskoye highway. Get to st. Metro "Myakinino", "Mitino" or "Volokolamskaya" can be reached in 15-20 minutes by transport. A 5-minute walk is the railway station "Pavshino".

Metro station "Mitino" → Walk 140 meters (2 minutes) → Stop "m. Mitino» → Bus No. 32, fixed-route taxi No. 492, 537, 66, 876, 878 (7 minutes) → Stop «Pavshino-2» → Walk 720 meters

Like other new buildings near Moscow, the new residential complex in Krasnogorsk is distinguished by good ecology and transport accessibility. It is surrounded by green alleys, parks, adjacent to forests and reservoirs. From the new building to the Moscow Ring Road (along the Volokolamsk highway) - 2.5 km. Electric trains and buses run constantly to Moscow. To the metro station "Tushinskaya", "Mitino", "Strogino" - 10-15 minutes by public transport. From the metro station "Barrikadnaya" to the new building - 15-20 minutes by private transport (along Zvenigorodskoye, and then along Novorizhskoye highway).

Infrastructure

Within walking distance from the complex, in the new quarter "Molodyozhny", it is planned to build kindergartens, medical institutions, shops, service centers, restaurants and cafes. Near the quarter there are schools, special secondary educational institutions and universities. There are also buildings of legislative, administrative and executive bodies of the Moscow region, a large business center. A ski resort is located 500 meters from the quarter. Not far from the residential complex "Molodyozhny I", on the Moscow River, there is a yacht club.

Moscow region, Podolsk, st. Ring, possession 3

ATTENTION! DISCOUNTS FOR APARTMENTS IN YOUTH residential complex!

The object was put into operation. Issuance of keys

  • All apartments are sold

  • - PRICE (PRICES).

  • MORTGAGE:

    Military personnel who have become participants in the accumulative mortgage system (NIS) of housing provision have the opportunity to use the accumulated funds to purchase an apartment under the program "Military Mortgage" from OAO Sberbank of Russia.

    About LCD YOUTH

    1. Project:

    A multi-storey residential building with built-in and attached non-residential premises and engineering networks, at the address: Moscow Region, Podolsk, st. Ring, possession 3 .

    2. Base:

    The construction of the facility is carried out on the basis of: Investment contract No. 158 dated March 23, 2012, concluded between the Municipal Formation "City District Podolsk, Moscow Region", LLC "Stroyservis" and LLC Repair and Construction Enterprise "OREOL"

    3. Terms of project implementation:

    Start of construction - May 2013
    Completion of construction - December 2015

    4. Land plot:

    The area of ​​the land plot is 3,935 sq. meters. Cadastral number 50:55:0010104:27. The land plot allocated for construction is located in the northern part of the city of Podolsk. The boundaries of the site are: from the north - the existing multi-storey buildings; from the east - an intra-quarter passage, then - the territory of the dining room and the quarter with multi-storey residential buildings; from the west - the territory of a 2-storey office building; from the south - st. Ring. The owner of the land plot is LLC Repair and Construction Enterprise "OREOL" (Certificate of state registration of ownership 50 - AD No. 060800 dated 15.08.2012). Land lease agreement No. 03/09 dated 03.09.2012, concluded between Stroyservis LLC and Repair and Construction Enterprise OREOL LLC, registered by the Office of the Federal Service for State Registration, Cadastre and Cartography in the Moscow Region under No. 50-50- 55/065/2012-041 dated 11/01/2012 Resolution of the Head of the city of Podolsk "On changing the type of permitted use of the land plot ..." No. 725-p dated 05/05/2012. Lease term until November 01, 2014.

    5. Improvement elements:

    Landscaping of the territory provides for the arrangement of a children's playground, recreation areas, planting lawns, ornamental trees of various species, shrubs, making paths and sidewalks.

    6. Location:

    The facility is located in the north of Podolsk, in the Novo-Syrovo residential area. The facility is located 10 minutes walk from the railway station "Silikatnaya". The nearest transport highway is Simferopol highway, 15 km. from MKAD.

    7. Technical and economic indicators:

    Building area - 1,997.73 sq.m

    The total area of ​​the project is 24,585.56 sq.m.

    including: total area of ​​apartments - 16,505.11 sq.m;

    Apartment types:

    • one-room apartments - 160 pcs;
    • two-room apartments - 160 pcs;
    • three-room apartments - 16 pcs.
    • In total - 336 apartments.
    • Useful area of ​​office space - 1,290.82 sq.m.

    8. Specifications:

    The house consists of 5 17-storey semi-detached sections. Blocking - "L" - shaped in plan in which:

  • along st. Ring interlocked 2 sections;
  • along the side, perpendicular to the street. Ring - 2 sections;
  • the sides are united by one corner section.

    In the above-ground part of each section there are 3 main functional blocks of premises:

  • a block of administrative premises located on the 1st floor and isolated from the residential part of the building by walls, partitions and ceilings;
  • block of residential premises (residential part of the building) with residential premises (apartments) located on floors 2-17 with common areas - corridors, elevators and elevator halls, a staircase and on the 1st floor an entrance group of premises with an elevator hall. Communication between the floors of the residential part is carried out through a smoke-free staircase and through elevators.
  • a technical floor intended for laying engineering communications and placing premises for engineering and maintenance of elevators.
  • A technical underground was designed under the building.
  • The roof of the building is flat, multi-level, with an internal organized drainage system.

    9. Functional purpose of non-residential premises:

    On the first floor of the residential building there are public premises

    10. Composition of common property:

    The common property that will be in common shared ownership includes: premises that are not parts of apartments and are intended to serve more than one residential and (or) non-residential premises (hereinafter referred to as common use premises), including inter-apartment landings, stairs, elevators, elevator and other shafts, corridors, attic, technical rooms of the basement, in which there are engineering communications, and other service equipment; roof; enclosing load-bearing structures of the house (including foundations, load-bearing walls, floor slabs, balcony and other slabs, load-bearing columns and other enclosing load-bearing structures); windows, doors, railings, parapets and other enclosing non-bearing structures of common areas; mechanical, electrical, sanitary and other equipment of common areas.

    11. Estimated period for obtaining permission to put the facility into operation:

    Estimated deadline for obtaining permission to put the facility into operation is the fourth quarter of 2015. Services participating in the commission for the acceptance of the facility into operation: Administration of the Municipal Formation of Podolsk, Moscow Region, Main State Construction Supervision for the Moscow Region, representatives of the Customer.

    12. List of organizations carrying out the main work:

    LLC "Architectural Bureau Mikaelyan" - design work, architectural supervision;

    OOO "Stroyservis-1136" - General contractor.

    13. Design declaration

    Construction is carried out in accordance with .(pdf, 6 Mb)

    14. Permission to put the facility into operation

    Contacts

    For questions related to the sale of apartments:

    Tel/Fax: Lyudmila +7-925-007-12-55

    Location of the new building

    Construction stages of residential complex Molodyozhny

  • Have questions?

    Report a typo

    Text to be sent to our editors: